What a bathroom renovation costs in Orangeville and Dufferin County, and what moves the number.
Rough budgets before HST. The real number comes after a site visit and your selections. Moving plumbing costs more than keeping it where it is.
Rough budgets before HST. HST at 13% goes on top.
Treat these as a starting point for a budget, not a quote. Your selections move the number more than anything else.
Keeping the toilet, shower and sink where they are keeps the plumbing simple. Moving them costs more.
A tiled walk-in shower with glass costs more than a tub and surround.
Large-format or detailed tile takes more time to set.
The vanity, toilet, faucets and glass you pick.
Old plumbing, rot or wiring found at demolition gets fixed before the new bathroom goes in.
Cutting the slab for drains or adding a pump adds cost.

Start with a site visit. We look at the room, the plumbing and what you want.
Then a detailed price once your layout and selections are set.
Book a site visitMost run $10,000 to $30,000+ before HST.
About $10,000 to $15,000 with the same layout and new finishes.
$35,000 to $70,000+, usually with layout changes and custom work.
No. The budgets on this page are before HST.
About 2 to 3 weeks of work, plus 1 to 2 more if the layout changes.
A site visit shows what the space can hold and what the plumbing allows.