When a bathroom renovation needs a permit from the Town of Orangeville, how to apply and what gets inspected.
Often. The Town of Orangeville lists any installation or alteration of a plumbing system as permit work.
Not sure? Ask the Town before you start. Electrical work is reported to the Electrical Safety Authority, not the municipality.
The Town asks for drawings to scale, in metric. For an interior bathroom job, plan on these.
The Town's building permit application, and a letter of authorization if you aren't the owner.
The bathroom as it is and as it will be, with every fixture shown.
Drains, vents and water lines for the new fixtures.
Any wall that moves or joist that gets cut, with how it's supported.
The exhaust fan and where it vents.
Digital PDFs to scale. The Town encourages digital submissions.
Applications go to the Town by email or in person at Town Hall, 87 Broadway.
By email or at Town Hall, 87 Broadway.
10 business days for a complete residential application.
Fees are paid once the Town finalizes the permit.
Plumbing gets inspected before the walls close.
Closes the permit.

The Town lists every required inspection on your permit. Book each one at least 24 hours ahead.
If you install or change the plumbing, yes. The Town lists any installation or alteration of a plumbing system as permit work.
By email or in person at Town Hall, 87 Broadway. The Town encourages digital PDFs.
The Building Code gives 10 business days for a complete residential application.
At least 24 hours. Skipping a required inspection can mean opening up finished work.
The 2024 Ontario Building Code, for applications made from April 1, 2025.
The Electrical Safety Authority, separate from the Town's building permit.
A site visit shows what the space can hold and what the plumbing allows.