Orangeville Bathroom Renovations Orangeville · Mono · Amaranth · Shelburne
Dated bathroom with an almond tub, oak vanity and beige tile
Town of Orangeville

Bathroom Permits in Orangeville

When a bathroom renovation needs a permit from the Town of Orangeville, how to apply and what gets inspected.

Book a site visit Call 416-995-4534
  • Review: 10 business days
  • Book inspections 24 hours ahead

Do you need a permit for a bathroom renovation in Orangeville?

Often. The Town of Orangeville lists any installation or alteration of a plumbing system as permit work.

Needs a building permit

  • Adding a new bathroom
  • Moving a toilet, shower or sink
  • Adding a new fixture
  • Moving or removing walls
  • Cutting floor joists for a drain

Usually no permit

  • Painting
  • New flooring
  • A new vanity top or mirror with no plumbing changes

Not sure? Ask the Town before you start. Electrical work is reported to the Electrical Safety Authority, not the municipality.

What does the Town need with the application?

The Town asks for drawings to scale, in metric. For an interior bathroom job, plan on these.

Application

The Town's building permit application, and a letter of authorization if you aren't the owner.

Floor plan

The bathroom as it is and as it will be, with every fixture shown.

Plumbing layout

Drains, vents and water lines for the new fixtures.

Structure

Any wall that moves or joist that gets cut, with how it's supported.

Ventilation

The exhaust fan and where it vents.

Format

Digital PDFs to scale. The Town encourages digital submissions.

How long does a bathroom permit take in Orangeville?

Applications go to the Town by email or in person at Town Hall, 87 Broadway.

  1. 1

    Apply

    By email or at Town Hall, 87 Broadway.

  2. 2

    Review

    10 business days for a complete residential application.

  3. 3

    Permit issued

    Fees are paid once the Town finalizes the permit.

  4. 4

    Rough-in inspection

    Plumbing gets inspected before the walls close.

  5. 5

    Final inspection

    Closes the permit.

Unfinished basement corner with capped drain pipes in the concrete floor

What gets inspected?

The Town lists every required inspection on your permit. Book each one at least 24 hours ahead.

  • Inside drains
  • Rough-in plumbing
  • Framing, if walls move
  • Final inspection
Book a site visit

Bathroom permit questions

Do I need a permit to renovate a bathroom?

If you install or change the plumbing, yes. The Town lists any installation or alteration of a plumbing system as permit work.

How do I apply?

By email or in person at Town Hall, 87 Broadway. The Town encourages digital PDFs.

How long does the review take?

The Building Code gives 10 business days for a complete residential application.

How much notice do inspections need?

At least 24 hours. Skipping a required inspection can mean opening up finished work.

Which Building Code applies?

The 2024 Ontario Building Code, for applications made from April 1, 2025.

Who does the electrical permit?

The Electrical Safety Authority, separate from the Town's building permit.

Finished basement living room with a large sectional

Book a site visit

Tell us about your bathroom and we'll call you back to set up a visit.

By sending this, you agree we can share your request with a contractor who serves your area. See our privacy policy.

Start with a look at your bathroom

A site visit shows what the space can hold and what the plumbing allows.

Book a site visit 416-995-4534