Add a full bathroom to your basement. How the drain works, what the Town inspects and what it costs.
Most basements can take a bathroom. These are the parts that decide how easy it is.
If the main sewer line runs below the basement floor, the bathroom drains by gravity. If it sits above, the toilet needs a pump.
New drain lines usually go under the concrete floor, so the slab gets cut and patched.
Some houses already have capped drain pipes in the floor. That saves cutting and time.
An exhaust fan vented outside. Basements hold moisture, so this one matters.
Ducts and beams can hang low in a basement. The layout works around them.
New fixtures change the plumbing system, so the Town permits and inspects the rough-in.
Rough budgets before HST. The real number comes after a site visit and your selections.
A basement bathroom with no rough-in, where the slab gets cut and a pump goes in, lands toward the higher end.
We find the main drain and check for a rough-in.
Where the toilet, shower and vanity go, around the drain and ducts.
Plumbing changes go to the Town of Orangeville.
Drains, water lines and the fan, then the rough-in inspection.
Waterproofing, tile, vanity, toilet and glass.
The final inspection closes the permit.

Usually, yes. The main question is whether the drain sits above or below the floor.
Only if the main sewer line is above the basement floor. Then the toilet needs a sewage pump or an upflush system.
Yes. A new bathroom changes the plumbing system, which the Town lists as permit work.
About 2 to 3 weeks of work, plus 1 to 2 more if the slab has to be cut for new drains.
Yes. An exhaust fan vented outside keeps moisture down in a basement.
A site visit shows what the space can hold and what the plumbing allows.